Triplo W TW-SOLAR Installation Manual

The Triplo W TW-SOLAR is a high-efficiency solar panel system designed for residential and commercial applications, featuring monocrystalline silicon cells, robust aluminum frame, tempered glass surface, IP67-rated junction box, and compatibility with standard mounting systems. It includes connectors, grounding hardware, and comprehensive monitoring capabilities. Below are key sections for safety, components, installation planning, mounting, electrical connection, commissioning, maintenance, and troubleshooting.

1. System Components 2. Safety Precautions 3. Site Assessment & Planning 4. Mounting System Installation 5. Panel Mounting Procedure 6. Electrical Wiring & Connection 7. System Commissioning 8. Monitoring & Maintenance 9. Technical Specifications 10. Warranty & Support 11. Troubleshooting

System Components

Key components included in the TW-SOLAR package: Solar Panels, Mounting Rails & Brackets, MC4 Connectors, Grounding Lugs, Junction Boxes, Installation Manual.

ComponentDescription
Solar Panel (TW-400M)Monocrystalline, 400W, 72-cell configuration
Mounting RailsAluminum rails for roof or ground mounting
End Clamps & Mid ClampsFor securing panels to rails
MC4 Connectors (Pair)Weatherproof connectors for series/parallel connection
Junction BoxIP67 rated, with bypass diodes
Grounding Lug KitFor panel and system grounding
Mounting Brackets (L-Feet)For attaching rails to roof structure
Bolts & HardwareStainless steel fasteners for assembly

Safety Precautions

Installation must be performed by qualified personnel in accordance with local electrical and building codes.

  1. Electrical Safety: Panels generate DC voltage when exposed to light. Cover panels with opaque material during installation.
  2. Structural Safety: Ensure roof or mounting structure can support panel weight and wind/snow loads.
  3. Personal Safety: Use fall protection, wear insulated gloves, and safety glasses.
  4. Weather Conditions: Do not install during rain, snow, or high winds.

WARNING! Risk of electric shock and fire. Disconnect all sources of power before working on system. Use appropriate PPE.

Site Assessment & Planning

Evaluate installation site for optimal performance and safety.

  1. Sun Exposure: Ensure no shading between 9 AM and 3 PM for maximum yield.
  2. Roof Inspection: Check integrity, material, and angle. Verify load capacity.
  3. Orientation & Tilt: In Northern Hemisphere, orient panels true South. Optimal tilt equals latitude.
  4. System Layout: Plan array layout, wiring routes, and inverter location.
  5. Permits & Codes: Obtain necessary permits and review local regulations.

CAUTION! Consult a structural engineer if roof condition is uncertain.

Mounting System Installation

Panel Mounting Procedure

Lift and secure panels onto installed rails.

  1. Position first panel at starting corner of array.
  2. Place panel on rails and secure with end clamps at both ends.
  3. Add subsequent panels, using mid clamps between panels.
  4. Ensure all panels are aligned and clamps are tightened to specified torque (typically 15-20 Nm).
  5. Do not step on panels or apply excessive pressure to glass surface.

Tip: Use a panel lift or multiple installers for safe handling.

Electrical Wiring & Connection

Connect panels in series or parallel as per system design.

  1. Route cables from panels to combiner box/inverter along designated pathways.
  2. Connect panels using MC4 connectors: male to female, ensuring positive (+) to negative (-) for series strings.
  3. Ground each panel and rail system using grounding lugs and copper wire (min. 6 AWG).
  4. Label all strings and connections clearly.
  5. Test open-circuit voltage (Voc) and short-circuit current (Isc) of each string before connecting to inverter.

WARNING! Verify polarity before making final connections. Incorrect wiring can damage equipment.

System Commissioning

Final checks and activation of the solar array.

  1. Visual Inspection: Verify all mechanical and electrical connections are secure and correct.
  2. Insulation Resistance Test: Perform megger test per IEC 62446.
  3. Performance Check: With inverter connected and grid permission, monitor initial power production.
  4. Monitoring Setup: Activate online monitoring platform using system serial number.
  5. Documentation: Complete commissioning checklist and provide to customer.

Monitoring & Maintenance

Regular maintenance ensures long-term performance.

Monitoring: Access real-time data via Triplo W Solar App or web portal. Check for alerts or underperformance.

Maintenance Tasks:

CAUTION! Do not clean panels when surface is hot or during peak sun hours to avoid thermal shock.

Technical Specifications

ParameterSpecification
ModelTW-SOLAR (TW-400M Panel)
Maximum Power (Pmax)400 W
Open Circuit Voltage (Voc)48.5 V
Short Circuit Current (Isc)10.4 A
Maximum Power Voltage (Vmp)40.8 V
Maximum Power Current (Imp)9.8 A
Module Efficiency20.5%
Dimensions (L x W x H)2016 x 1002 x 35 mm
Weight22.5 kg
Operating Temperature-40°C to +85°C
Power Tolerance0 ~ +5 W
Warranty25-year linear power output, 12-year product

Warranty & Support

Triplo W warrants that the TW-SOLAR panels will meet specified power output for 25 years (linear degradation, not exceeding 0.5% per year) and are free from material defects for 12 years. This warranty is valid only if installed by a certified installer according to this manual. For support, visit www.triplow-solar.com/support or contact +1-800-555-SOLAR. Keep original purchase receipt and commissioning documents for warranty claims.

Troubleshooting

SymptomPossible CauseCorrective Action
No power outputTripped breaker, shading, faulty connectionCheck inverter status and DC disconnects; inspect for shading or loose MC4 connectors.
Low power generationDirty panels, string mismatch, inverter issueClean panels; verify all panels in string are identical and connected correctly; check inverter logs.
Hot spots on panelBypass diode failure, cell damageContact technical support; may require panel replacement.
Water ingress in junction boxSeal failureDisconnect power, replace junction box or seal.
Monitoring offlineCommunication loss, WiFi issueCheck data logger connections and local network; reboot monitoring device.

Reset: For inverter or monitoring issues, power cycle system (AC then DC).

Service: +1-800-555-SOLAR; www.triplow-solar.com/support

Triplo W TW-SOLAR Installation Manual © - All Rights Reserved 2025